To face the growing Energy demand in Italy, and thanks to the Michele Vona’s entrepreneurial foresight, Vona Energy, the newest division of the group, has been created to coordinate Energy projects in all their forms:
Thanks to the Building and Construction century long experience, Vona has now been working as General Contractor, EPC Contractor and O&M Contractor for 3 years in the renewable Energy market, attending to every sector’s requests. Being a professional in the realization of turnkey photovoltaic plants, Vona Energy has found the perfect formula to place itself on the green market and up to now has created large plants on the entire Italian territory, thanks to agreements with Italian and foreign investors, for a total of more than 100 MW power. Incentives are a certainty with Vona The attention given to the entire construction process through the design verification of the plant’s construction stages, from pole driving to solar panels assemblage, and the absolute attention given to fast execution periods, thanks to which the company has received several acceleration awards, today make Vona Energy a solid and trustworthy partner, able to guarantee quality results in record time according to a construction site management similar to industrial production rather than a classical building one. Vona works as EPC contractor even when realizing photovoltaic green houses capable of producing clean Energy for the cultivation of plants and vegetables, offering an adequate solution for agriculture. To ensure a greater sunlight filtering, useful for cultivations, transparent modules are selected for roofing in addition to monocrystalline silicon ones, guaranteeing a 13-17 % performance on the whole, which is two times more in comparison to normal panels. Not just photovoltaic Being part of a company that deals with cogeneration plant construction and management i in industrial settings, part of a project promoted by CBI Frosinone (Industrial Association), Vona Energy also extends its activity to other Energy sectors concerning renewable sources. The first of two cogeneration power stations of 4MW (San Marino Power station) has started production in May 2008 and the second 3.2MW power station has began production in January 2009 (Cerrone Power station). |
CREATION
Photovoltaic power station Montalto di Castro (VT) – 24MW by 2009
|